Skip to content
Menu
Top-down aerial view of a production hall roof with two fields of solar panels
  • PV as designed, strings and array 2 (proposed)
  • PV AC switchboard, metering (proposed)
  • grid connection, reserved capacity (proposed)
DrawingPV site plan

What matters is not annual consumption but when you consume

A commercial PV plant earns money when its output coincides with consumption. That is why we design it from the 15-minute load profile, which we request from the distribution system operator on your behalf, and not from the annual consumption on your invoice.

The same data shows how much you pay for reserved capacity and when your demand peaks occur. That is often a bigger cost than the energy itself, and it is solved by a controlled battery, not more panels. We cover the whole project, including the transformer station, MV connection and service, with one partner.

Capacities
30 kWp to over 1 MWp
Completed
495+ projects, 34 MWp
Design from data
15-min load profile
Connection
ZSD, SSD, VSD
Panels
LONGi, AIKO, Trina, Qcells
Inverters
Huawei, Sungrow, GoodWe, Solinteg

What we supply

1

Assessment and design

Top-down drone view of a hall roof with a solar array
Aumovio, Zvolen, rooftop PV
  • Technical and economic assessment from your invoice and interval data
  • Placement: roof, open land or carport, roof structural check
  • Design documentation in EPLAN, fire safety, lightning protection
  • Connection application and negotiation with the distribution system operator
  • Subsidy documents when a call is open
2

Installation by our own crews

String inverters under a canopy on the roof, cabling in trays
Lúka, Budiš, inverters
  • Mounting structures, panels, DC and AC cabling
  • Huawei, Sungrow, GoodWe or Solinteg inverters as designed
  • Switchboards from our own production, metering, protection
  • MV connection and transformer station where the capacity requires it
  • Initial inspection and commissioning
3

Operation

Three inverters on a steel structure on the roof of the store
XXXLutz, Nitra, inverters
  • 24/7 monitoring by the monitoring centre
  • Service contract with inspections, cleaning and electrical testing on schedule
  • Battery storage and EnergoMind for peak shaving and spot-price optimisation
  • Charging stations for your fleet
  • Extending the plant as consumption grows

Who it is for

  • Manufacturing and industrydaytime consumption, a large roof, reserved capacity as a significant cost
  • Logistics and retailhalls, refrigeration, fleet charging, often with an MV connection
  • Agriculture and food producersseasonal consumption, subsidy calls from PPA (the Slovak Agricultural Paying Agency), combined with a battery
  • Developers and investorssolar PV as part of a new site with a transformer station from the start

How we work together

  1. 01

    Assessment from your invoice and data

    Send your invoice and 15-minute data. Within three working days you have capacity, battery, economics and subsidies.

  2. 02

    Site visit and design

    Structural check, cable routes, space for the switchboard and battery. Design and connection application.

  3. 03

    Permits and contracts

    Notification or permit, connection agreement, subsidy application with our documents.

  4. 04

    Construction

    Our own installation crews, electricians and inspection technicians. We are responsible for the deadline.

  5. 05

    Commissioning and service

    Connection, electrical inspection, documentation, monitoring centre monitoring, service contract.

Two installers in high-visibility vests fitting panels on the flat roof of a hall
PV installation on a flat roof
34MWp
installed capacity
495+
completed projects
5to 9 weeks
usually from signing to commissioning

Free technical and economic assessment

From your invoice and 15-minute data we calculate PV capacity, battery size, reserved capacity, economics and subsidy eligibility. You have the result within three working days.

We use the number to call you back and store it with your enquiry under our privacy policy. How we process data

What decides the economics of a company PV plant

Capacity follows the load profile, not the roof area

From 15-minute data we see how much of the output is actually consumed. A larger plant without a battery often means only more surplus sold at the feed-in price.

A battery sized for a subsidy is not a battery sized for economics

Calls set a kWh-to-kW ratio. If you want peak shaving and spot-price control, we size a second battery from your data, not from the call.

We treat grid connection as part of the delivery

Connection conditions, the MV connection and the transformer station decide the timeline more than installation does. That is why we handle them from day one, with our own people.

Current calls for businesses and their conditions are on the page Subsidies. Battery storage and control by spot prices are on the page Battery storage.

Why do it with us

495+ projects, 34 MWp installed capacity

From 30 kWp on a workshop roof to more than 1 MWp for industry.

Our own team for the whole project

Design, engineering, installation, switchboards, inspections and dispatch are all employees.

MV expertise

We build and manage transformer stations and MV connections; a larger plant cannot happen without them.

Certified partner of manufacturers

Huawei, GoodWe, Solinteg, Sungrow, LONGi, Qcells. ISO 9001, 14001 and 45001.

One project, six services

It is rarely just one thing. On a single delivery we also handle what sits upstream and downstream in the circuit.

Questions we get asked

1How much does solar PV for a business cost?

The price per kWp falls with plant size and depends on the roof, technology, connection and whether a battery or transformer station is included. We do not quote without a site visit and consumption data; within three working days of receiving your invoice and interval data you get a technical and economic assessment with an indicative budget.

2What is the payback?

With a suitable design and high self-consumption, typically a single-digit number of years; the exact figure depends on your load profile, electricity price and subsidy. The assessment uses your 15-minute data, not an average.

3How much roof do I need?

Roughly 5 to 7 m² per 1 kWp on a flat roof with row spacing. For 500 kWp that is about 3,000 m². The roof's load capacity is verified by a structural engineer, whom we arrange.

4Do I need a building permit?

It depends on capacity and on whether it is a roof or land. Permits, notifications and negotiation with the distribution system operator are part of the delivery; our engineering team handles them.

5Who looks after the plant after commissioning?

Our monitoring centre, which monitors more than 300 systems around the clock. The service contract covers inspections, cleaning, electrical testing on schedule and faults within the agreed time.

6Can solar PV be combined with a subsidy?

Yes; current calls for businesses and their conditions are on the Subsidies page. We promise the process, not the outcome: we prepare the documents and size the battery according to the call conditions.

Non-binding enquiry

State your annual consumption or monthly bill, type of operation and whether you have your own transformer station. We will get back to you by the next working day.

Businesses and municipalities: obchod@energovision.sk
Phone: +421 908 366 332
Book a meeting slot (opens in a new window)

Your details

* required fields

How should we reply?

Only the contact you choose is required. You can leave the other one empty.

e.g. 450 MWh or €9,000 a month

We reply by the next working day. 35 specialists. Projects across Slovakia.