Skip to content

Menu

Six services, one project

A company's energy system is one circuit from the distribution grid to the point of consumption. We design, build, connect and service every part of it with our own team of 35 specialists.

Legend

The electrical path we cover end to end

  1. 01

    Distribution grid

    22 kV MV connection, negotiation with the distribution system operator

  2. 02

    Transformer station

    construction, refurbishment, operation and inspections

  3. 03

    Switchboard and distribution

    in-house LV switchboard production, industrial electrical installations

  4. 04

    Generation and battery

    solar PV plant and battery storage controlled by EnergoMind

  5. 05

    Consumption

    EV charging stations, process equipment, peak shaving based on the 15-minute load profile

  6. 06

    Monitoring centre

    24/7 monitoring, service contracts, inspections and testing on schedule

In-house specialists
35
Completed projects
495+
Installed capacity
34 MWp
Systems monitored 24/7
300+

Three projects up close

All 143 projects on the map
  1. Lúka industrial site near Budiš in morning fog, hall roofs covered with solar panels

    Budiš, Lúka industrial site

    Capacity: 1,063 kWp · Type: rooftop PV on several halls

    Brief
    A production site with high daytime consumption and the roofs of several halls. Goal: cover as much consumption as possible with own generation without restricting operations during construction.
    Solution
    A 1,063 kWp rooftop plant spread over several halls, inverters concentrated under a canopy with cable routes in trays, connection and commissioning by our own crews.
    Result
    The 1,063 kWp plant runs under continuous monitoring and generation is evaluated monthly.

    Full project

  2. Aumovio Zvolen site from a drone, halls with solar panels on the roofs, mountains in the background

    Aumovio (Continental), Zvolen

    Capacity: 556 kWp · Battery: 120 kWh

    Brief
    An automotive plant with continuous production, demand peaks and a group requirement for a measurable reduction in carbon footprint.
    Solution
    556 kWp of solar PV on the hall roofs, 120 kWh of battery storage to cover peaks and a transformer station for the connection, all in one project with a single point of responsibility.
    Result
    556 kWp of solar PV, a 120 kWh battery and a transformer station in one project, controlled by EnergoMind under 24/7 monitoring.

    Full project

  3. XXXLutz Nitra furniture store with car park, drone view

    XXXLutz, Nitra

    Capacity: 171 kWp · Connection: own transformer station

    Brief
    A new furniture store with a green roof and its own metering point. Goal: solar PV that respects the roof build-up, and a transformer station ready for future growth in demand.
    Solution
    A 171 kWp plant on a structure above the green roof, inverters on the roof away from public areas, a kiosk transformer station and an MV connection to the distribution grid.
    Result
    The store has generated its own electricity since opening and the transformer station is ready for future demand growth.

    Full project

Non-binding enquiry

Tell us what you are dealing with, even if you do not yet know which service it is. We will get back to you by the next working day.

Businesses and municipalities: sales@energovision.com
Phone: +421 908 366 332
Book a meeting slot (opens in a new window)

Your details

* required fields

How should we reply?

Only the contact you choose is required. You can leave the other one empty.

We reply by the next working day. 35 specialists. Projects across Slovakia.